Recently, a large number of timeouts and routing errors on our Metasys system have alerted us to a problem. The spare capacity on the upstream network shows that the Metasys controller is leaving the S4 router space to blend in message on the trunk for the purposes of the BACnet interface. 

View Chipkin Automation Systems Case study


“Investigate before you integrate....”